Eight windows installation and construction considerations, it is worth a look i

  Before installing respond doors (doors renovation renderings) shape and position accuracy of the hole to stake out check, check number and location of embedded concrete meets design requirements, whether high-level access to the mine with the required window, for failed portionsIt should urge the construction unit for rectification.

 

1. crossed positioning

 

(1) according to the installation position of the doors and windows of the design drawings, dimensions and elevation, according to the doors and windows on both sides of the center line to measure out the door edges. If a multilayer or high-rise buildings, in order to prevail in the top-level windows sideline, with lines falling or theodolite will lead next door edge, door and window in the layers at the scribe mark on the individual's mouth is not straight edge should tick chisel handle.

 

(2) the horizontal position of doors and windows should be based on horizontal floor indoor + 1250px prevail up anti-skin elevation Measure the window, looking straight elastic line. Each layer must be kept under the skin level consistent window.

 

2. Aluminum window Phi water installation

 

According to the construction drawings will be fixed on the water draped aluminum windows, and to ensure the correct position, securely installed.

 

3. embalmed

 

(1) embalmed design around the outer surface of the door frame is required, according to design requirements process. If the design does not require, anti-corrosion coating can be painted or pasted plastic film for protection, in order to avoid direct contact with cement mortar surface aluminum doors and windows, to produce an electrochemical reaction, corrosion of aluminum windows and doors.

 

(2) When installing aluminum windows and doors, if the fixed connection pieces of iron, the connection of iron parts, fasteners and other metal parts installed preferably stainless steel. Otherwise, it must be embalmed, in order to avoid electrochemical reaction, corrosion of aluminum windows and doors.

 

4. aluminum windows and doors in place

 

According to the doors and windows draw good positioning line, install aluminum door frames. And timely adjust the door frame of horizontal, vertical and diagonal length meet quality standards, and then temporarily fixed wedge.

 

5. Fixed aluminum windows and doors

 

(1) When there are embedded pieces of iron on the wall, it can be directly to the aluminum doors and windows with iron feet directly embedded iron wall weld on the weld to be done anti-rust treatment.

 

(2) when there is no embedded iron on the wall, using metal or plastic expansion bolt expansion bolts aluminum alloy doors and windows iron legs fixed to the wall.

 

(3) when there is no embedded iron on the wall, the wall can also be used to play 80mm deep drill holes of 6mm diameter, with L-shaped steel 6rmn of 80mm × 50mm. In the long end of the stick coating 108 glue mud, and then into the hole. After the final setting of 108 glue mud, then aluminum doors and windows with iron legs buried 6mm steel weld.

 

6. door frame and the wall between the gap between processing

 

(1) aluminum doors mounting, should be hidden works acceptance, after passing the timely processing gap between the door frame and the wall according to design requirements.

 

(2) If the design does not require, we can use an elastic material or glass wool insulation felt strips layered filling the gap, leaving the outer surface 5 ~ 8mm deep trench mouth caulking caulking or sealant ointment.

 

7. The doors, windows and doors installed glass fan

 

(1) fan windows and doors and glazing should be installed after the completion of the hole wall surface decoration.

 

(2) sliding doors in the door frame mounting, the fan with a good overall safety glass doors slide into the frame, adjust the gap to the fan frame.

 

(3) Swing window in the frame and fan assembly grid on the wall, and then install fixed safety glass, which is to adjust the fan frame and the gap, and then the glass Anren fan and adjust the position of the last mosaic seal, caulking sealant.

 

(4) spring door should be fixed into the ground before security doors in the door frame and floor spring host. First glass insert doors trellis frame in place and people together, adjust the fan frame gap, finally caulked seal glass doors and sealant.

 

8. Construction Notes

 

(1) Note that when using multiple combinations of aluminum doors and windows assembly quality, fight head should be smooth, not split edge is not channeling angle.

 

(2) do the construction products must be strictly protected, catch up on fall protection seal damaged tape and film, promptly remove spilled mortar dirt surface in windows and doors, aluminum doors and windows to prevent surface contamination bite color.

 

(3) The thickness of the glass doors inlaid with fan stiles and seal groove dimensions to comply with national standards and design requirements, to leave room for maneuver when installing the seal, so as not to seal off.

<script src="/inc/AspCms_VisitsAdd.asp?id=323"></script>

 

下一篇:Doors and windows industry healthy development, the need to pay attention to bra
上一篇:Country shot! "Secondary housing reform," or introduced during the yea